Most small businesses do not fail because of a risk nobody could have imagined. They fail because of a risk everybody could see — the one big client, the one key person, the cash-flow gap every spring — that nobody wrote down, scored or planned for. A risk register is that writing-down, done properly: a short list of what could hurt the business, how likely it is, how badly it would hurt, and what you intend to do about it. This tool builds one with you in about fifteen minutes.

The 5 × 5 matrix and the four bands

Every risk gets two scores from 1 to 5: likelihood, meaning the chance it happens in the next twelve months, and impact, meaning the damage if it does. Multiply them and you get a score from 1 to 25, which falls into one of four bands:

BandScoreWhat it meansResponse
Low1–4Unlikely, minor, or bothAccept and monitor at reviews
Moderate5–9Worth a planned responseAgree a mitigation and an owner
High10–16Likely enough and damaging enough to act nowMitigate actively; review monthly
Severe17–25Could seriously wound or end the businessTreat as a priority project, not a note

Read equal scores carefully: a 5 can be a rare catastrophe (likelihood 1, impact 5) or a near-certain nuisance (5 × 1). The register keeps both numbers visible precisely so you treat those two differently — the catastrophe needs a contingency plan, the nuisance needs a process fix.

The five categories, explained

Financial risks are about money running out or arriving late: cash-flow gaps, losing a major client, an unexpected tax bill. Operational risks stop you delivering: a key person unavailable, a supplier failing, equipment or premises lost. Compliance and legal risks come from rules and promises: missed filings and renewals, contract disputes, safety or employment-law breaches. Cyber and data risks arrive through your systems: ransomware, a breach of customer data, account takeover or payment fraud. Market and reputation risks come from outside: a new competitor, a public complaint, a fall in demand. The fifteen prompts in the form are the most common entries in each category for a small business — they are prompts, not a census, which is why you can add your own.

Worked example: three risks scored

Take a small design studio. Its owner scores the cash-flow gap as likelihood 4 (it happens most years) and impact 5 (a bad quarter could end the business): 4 × 5 = 20, Severe. A data breach she scores likelihood 3, impact 5: 3 × 5 = 15, High. Losing her part-time bookkeeper — the key-person prompt — is likelihood 2, impact 4: 2 × 4 = 8, Moderate. The register sorts them 20, 15, 8, and the studio's attention goes where the arithmetic points: a cash buffer and faster invoicing first, backups and access controls second, documented bookkeeping procedures third. That ordering — not the paperwork — is the product of a risk assessment.

How to score honestly

Score the risk as it stands today, before any new mitigation — consultants call this the inherent risk, and it is the honest baseline. Use the full scale: if everything is a 3, nothing is prioritised. Anchor likelihood in evidence where you can — has it happened before, to you or to similar businesses? Anchor impact in money and time: an impact of 5 should mean something like "could close us" or "costs more than a month of revenue", an impact of 1 "an annoying afternoon". If you run the business with others, score separately and compare; the disagreements are usually the most informative part of the exercise.

Writing mitigations that actually work

A mitigation is a decision, not a wish. There are four honest kinds. Avoid: stop doing the risky thing — decline the client who is 60 percent of revenue until they are not. Reduce: make it less likely or less damaging — weekly backups and two-factor authentication reduce both the chance and the blast radius of a cyber incident. Transfer: pay someone else to carry it — insurance is the obvious case, and it transfers the financial impact, never the event itself. Accept: a legitimate choice for Low scores, as long as it is written down as a choice. Whatever you pick, name an owner and a date; a mitigation without either is a hope.

Reviewing the register

A register is a living list. Review the High and Severe entries monthly and the whole register quarterly. Re-score after anything material: a new biggest client, a new premises, a new system, a lost member of staff, an incident that nearly happened. When a risk materialises, write down what it actually cost — that number calibrates every future impact score you give. And when a mitigation is finished, do not delete the risk; lower its likelihood or impact score and note why. The history is what turns a form into management information.

What this tool is — and is not

This is a structured thinking aid built on the standard 5 × 5 method used across small-business risk guidance. It is not professional risk advice, not an insurance assessment, and not a compliance audit: regulated activities, workplace safety assessments and data-protection impact assessments have their own legal formats in many countries, and some risks — fire safety, food safety, safeguarding — must be assessed under those specific rules. If a score in this register worries you, that is the tool working: the next step is a professional in that field, and the register gives you a clear brief to hand them.

The full 5 × 5 matrix, cell by cell

The band table above summarises the matrix; here is the whole grid. Rows are likelihood, columns are impact, and every cell shows the score and its band. Two patterns are worth seeing once. First, the bands are not symmetrical stripes: a score of 12 can be 3 × 4 or 4 × 3, and both are High, while 3 × 3 = 9 stays Moderate — the jump from Moderate to High happens the moment either factor reaches 4 alongside a 3. Second, the corners behave very differently despite similar arithmetic journeys: 1 × 5 = 5 (Moderate) is a rare catastrophe that needs a contingency plan, while 5 × 1 = 5 (the same band) is a near-certain nuisance that needs a process fix. The number ranks the risk; the two factors tell you what to do about it.

Likelihood ↓ / Impact →12345
1 — Rare1 · Low2 · Low3 · Low4 · Low5 · Moderate
2 — Unlikely2 · Low4 · Low6 · Moderate8 · Moderate10 · High
3 — Possible3 · Low6 · Moderate9 · Moderate12 · High15 · High
4 — Likely4 · Low8 · Moderate12 · High16 · High20 · Severe
5 — Almost certain5 · Moderate10 · High15 · High20 · Severe25 · Severe

Only three cells in the whole grid reach Severe — 4 × 5, 5 × 4 and 5 × 5 — which is deliberate: Severe is reserved for risks that are both likely and damaging, or near-certain and major. If half your register lands in Severe, the scoring has drifted, not the business.

Worked example: a full register for a small café

The design-studio example above scored three risks. Here is a fuller pass: a café with six staff, one owner-chef, and a single main food supplier. The owner works through the fifteen prompts, skips the ones that genuinely do not apply, and scores six:

RiskCategoryL × IScoreBand
Cash-flow gap — money runs short before payments arriveFinancial4 × 416High
Supplier failure or stock shortageOperational3 × 412High
Key person (possibly you) unavailable for weeksOperational2 × 510High
Ransomware or malware locks your systemsCyber & Data2 × 510High
Demand drops in your main marketMarket & Reputation3 × 39Moderate
Negative reviews or a public complaint goes viralMarket & Reputation3 × 26Moderate

The register the tool returns is sorted in exactly that order — 16, 12, 10, 10, 9, 6 — with the summary counting four High, two Moderate and a top score of 16. Because at least one risk sits in High or Severe, the tool's note tells the owner to act on those first: a named owner, a mitigation and a review date for each. The mitigations write themselves once the ranking is visible: a second approved supplier and a small buffer stock for the 12; documented recipes and one trained deputy for the key-person 10 (the likelihood cannot fall much — people do get ill — so the work goes on the impact side); offline backups and two-factor authentication for the ransomware 10. The two Moderates get a planned response rather than a project: a quieter-season menu and events plan for demand, and a same-day reply routine for reviews. Nothing here required expertise the owner did not already have — it required the risks to be written down in an order.

Anchoring the scales: what a 1 and a 5 should mean

Scores only prioritise well if the numbers mean the same thing every time you score. The tool labels the scales — likelihood runs Rare, Unlikely, Possible, Likely, Almost certain; impact runs Minimal, Minor, Moderate, Major, Severe — but it is worth pinning your own anchors to them before you start, and reusing the same anchors at every review. One workable set:

ScoreLikelihood anchor (next 12 months)Impact anchor
1Would genuinely surprise you; no memory of it happening hereAn annoying afternoon; absorbed without cost
2Has happened to similar businesses you know ofA bad week, or a small unplanned cost
3Plausible this year; has nearly happened, or happened onceAround a month of profit, or one client relationship lost
4Happens most years, or conditions are lining up for itAround a quarter of profit, or a key relationship lost
5Expected — possibly more than onceCould close the business, or cost more than it can carry

Adapt the money anchors to your size — a month of profit means very different sums for a sole trader and a forty-person firm — but write them down and keep them. Anchors are what stop the same risk scoring 8 in January and 15 in June purely because the second scoring happened after a frightening news story.

Inherent and residual scores: scoring twice, honestly

Professional risk practice scores a risk twice. The inherent score is the risk as it stands today, before any new response — that is the score this tool asks for, and the one the register ranks by. The residual score is what remains once a mitigation is actually in place and working: backups tested, deputy trained, second supplier contracted. The gap between the two numbers is the value of the mitigation, stated in the same units as the problem.

This register holds one score per risk, so work it in two passes. First pass: score everything inherently and write the mitigations. Second pass, at the next review: re-score each risk as it now stands — with finished mitigations genuinely in place — and record the old score inside the mitigation note (“was 16; cash buffer and weekly invoicing brought likelihood to 3, now 12”). Never lower a score because a mitigation is planned, promised or half-done: a backup that has never been restore-tested has not yet reduced anything. Scoring the plan instead of the reality is the single most common way registers become fiction.

The one-page habit: keeping the register alive

A register built once and never reopened is a souvenir. The habit that keeps it useful is small: fifteen minutes a month, the same short agenda. Read the High and Severe rows first and ask only three questions of each — has anything changed, is the mitigation actually done, is the score still honest? Then scan the Moderates for anything that has quietly grown teeth: a client who has become a bigger share of revenue, a supplier whose service has slipped twice. Add new risks as they appear in real life — a new premises, a new system, a new biggest customer — rather than waiting for an annual exercise. Finally, copy or download the register (the buttons above the form save it as text) and file it with the month's date, so the history survives. Twelve dated one-page registers are worth more to a future buyer, insurer or lender than one thick document: they prove the business was being managed, continuously, by someone paying attention.

Reading the results: counts, top five and the note

When at least one risk has been scored, the tool answers with three things, and each has a job. First, the counts: how many risks you assessed, the single top score with its band, and how many risks sit in each band. The counts are a sanity check — a register of fifteen assessed risks with fourteen in Low and one in Severe is a very different business from one with five Highs, even before you read a single row. Second, the ranked table itself: every assessed risk, sorted by score, with its likelihood and impact shown separately so the reasoning survives the ranking. Third, the top five list, which repeats the five highest risks with the mitigation you wrote for each — or, pointedly, the words “not noted yet” where you have not written one. That list is the working document: print or copy those five and they are your action list for the month.

Underneath sits a note that changes with your results. If anything scored High or Severe, it tells you to act on those first — named owner, mitigation, review date. If nothing did, it tells you to keep the register and re-score quarterly and after any big change. Neither message is decoration: the first is the tool refusing to let a Severe score sit in a table unremarked, and the second is it refusing to manufacture urgency you have not earned. Risks you skipped — likelihood or impact left at “not assessed” — appear in neither the table nor the counts: an unscored risk is invisible to the arithmetic, which is why the honest move is to score a risk low rather than skip it.

Sources & References