What is a concrete calculator?

A concrete calculator works out how much concrete a shape will take — as a volume in cubic feet, cubic yards and cubic metres, and as a count of pre-mix bags — before you buy or order anything. Concrete is unforgiving material to estimate by eye. Order too little and a pour stops halfway, leaving a cold joint and a weak, ugly slab; order too much and you have paid for material that hardens in the truck or the wheelbarrow. The arithmetic itself is simple — length times width times depth — but it is remarkably easy to get wrong at the yard, in the aisle, or on the phone to the ready-mix plant, especially when the depth is in inches, the area in feet and the order in cubic yards. A calculator keeps the units straight, applies the same method every time, and adds the waste allowance that experience says you will need.

This page is built for the three shapes that cover almost every home and site pour: a rectangular slab (patios, shed bases, garage floors, walkways), a rectangular footing (the widened base under a wall or post, entered exactly like a slab), and a round column or post hole (fence posts, deck footings, sign posts, sonotube piers). Give it the dimensions and it returns the volume three ways, the bag count for the three standard pre-mix bag sizes, and every figure again with your waste percentage applied, shown separately so you can see exactly how much of the order is insurance.

One honest boundary before the numbers: this is a measuring tool, not an engineering tool. It counts volume. It does not design a mix, choose a slab thickness, size steel reinforcement or check your local building code — the sections near the end of this guide spell out everything it leaves out, so you can see precisely where the calculator's job ends and a specification, a code book or an engineer takes over.

How this concrete calculator works

Quick answer: Enter the shape, its length, width and depth (or diameter and depth for a round hole), and the calculator multiplies out the volume, converts it to cubic yards and cubic metres, and divides by each bag size's yield. A 10 ft × 10 ft × 4-inch slab needs 33.33 ft³ — 1.23 yd³ — which is 56 bags of 80 lb, or 62 bags with the default 10% waste added.

The calculator asks for a handful of numbers, and each one does a specific job:

  • Shape — slab, footing or round column / post hole. Slab and footing share the same rectangular maths; the round shape switches to the circle formula.
  • Length and width (feet) — the two horizontal dimensions of a rectangle. Measure the inside of the forms, not the outside, if the forms are already built.
  • Depth / thickness (inches) — how thick the pour is. Four inches is the standard patio and walkway thickness; the calculator converts inches to feet before multiplying.
  • Diameter (inches) and depth (feet) — for the round shape: the width of the hole or tube, and how deep it goes.
  • Waste (%) — the safety margin, defaulting to 10%. The results show the neat volume and the with-waste volume side by side, never merged into one unexplained number.

The preview updates as you type with the headline volume in cubic yards including waste, the same pour in cubic feet and cubic metres, bag counts for 40 lb, 60 lb and 80 lb pre-mix, and a breakdown table that repeats every figure with and without waste. Everything runs in your browser; nothing is uploaded. The sections below show the maths openly, including the exact worked example the figures above come from, so you can check the calculator against a pencil before you trust it with a real order.

The maths, worked step by step

The standard test case for this calculator — and the one to check it with — is a 10 ft × 10 ft slab, 4 inches thick, the classic small patio. Work it by hand:

  • Step 1 — convert the depth to feet: 4 inches ÷ 12 = 0.3333 ft.
  • Step 2 — multiply out the volume: 10 × 10 × 0.3333 = 33.33 cubic feet.
  • Step 3 — convert to cubic yards: 33.33 ÷ 27 = 1.235 cubic yards, shown rounded as 1.23 yd³.
  • Step 4 — convert to cubic metres: 33.33 × 0.0283168 = 0.94 cubic metres.
  • Step 5 — count the bags: an 80 lb bag yields 0.6 ft³, so 33.33 ÷ 0.6 = 55.56 — and since part-bags do not exist, that rounds up to 56 bags. The same volume is 33.33 ÷ 0.45 = 74.07 → 75 bags of 60 lb, and 33.33 ÷ 0.3 = 111.11 → 112 bags of 40 lb.
  • Step 6 — add waste: 33.33 × 1.10 = 36.67 cubic feet with the default 10% waste, which is 36.67 ÷ 0.6 = 61.11 → 62 bags of 80 lb.
FigureWithout wasteWith 10% waste
Volume (cubic feet)33.33 ft³36.67 ft³
Volume (cubic yards)1.23 yd³1.36 yd³
Volume (cubic metres)0.94 m³1.04 m³
80 lb bags (0.6 ft³ each)5662
60 lb bags (0.45 ft³ each)7582
40 lb bags (0.3 ft³ each)112123

Enter exactly those dimensions above — slab, 10 ft, 10 ft, 4 inches, waste 10% — and the calculator returns exactly those figures. Two habits in this table are worth noticing because every honest estimator shares them: volumes are rounded for display but never inside the bag maths, and bag counts always round up, never to the nearest bag. Rounding a bag count down is how a pour ends one bag short with the mixer already cleaned.

Slabs, footings and round columns: the three volume formulas

Rectangles — slabs and footings. Volume = length × width × depth, with every dimension in the same unit. The only trap is the depth, which everyone measures in inches and must be converted to feet (divide by 12) before it meets the feet of length and width. A footing is calculated identically; what makes it a footing is where it sits and what it carries, not its shape. A continuous wall footing 20 ft long, 16 inches wide and 8 inches deep is 20 × 1.333 × 0.667 = 17.78 ft³, or 0.66 yd³ — about 30 bags of 80 lb before waste.

Circles — columns and post holes. Volume = π × radius² × depth. The radius is half the diameter, and forgetting to halve it is the classic error: it quadruples the answer, because the radius is squared. A 12-inch diameter hole is a 6-inch (0.5 ft) radius, so a 3 ft deep hole is π × 0.5² × 3 = 2.36 ft³ — roughly four 80 lb bags before waste, not the sixteen the un-halved version suggests. Sonotubes and augers are sold by diameter, which is why this calculator asks for diameter and does the halving for you.

Everything else is rectangles and circles in disguise. An L-shaped patio is two rectangles. A curved border is a rectangle with an apology. Steps are a stack of thin rectangles, one per tread. When a shape genuinely will not decompose — a freeform pool deck, say — measure the area in square feet by any method you trust, multiply by the depth in feet, and enter that area as a 1 ft-wide slab of the same length in this calculator: a 180 ft² freeform patio at 4 inches is 180 × 0.3333 = 60 ft³, and entering length 180, width 1, depth 4 inches returns exactly that.

How many bags of concrete do you need?

Pre-mix bags are sold by weight, but what you are really buying is the yield — the volume of finished concrete one bag makes when mixed with the recommended water. The standard yields used by this calculator, and printed on the bags of the major manufacturers, are:

Bag sizeYield per bagBags per cubic footBags per cubic yardCovers at 4 in thick
40 lb0.30 ft³3.3390≈ 0.9 ft²
60 lb0.45 ft³2.2260≈ 1.35 ft²
80 lb0.60 ft³1.6745≈ 1.8 ft²

The bag-count formula is always the same: bags = volume in cubic feet ÷ yield per bag, rounded up. Which size should you buy? The 80 lb bag is the cheapest per cubic foot and the heaviest on your back; the 40 lb bag costs more per pour and doubles the mixing, but one person can carry it safely all afternoon. For anything beyond a few bags, the honest comparison is not bag versus bag — it is bags versus a ready-mix truck, which the next sections take up. Note also what the yield assumes: the bag mixed at the manufacturer's stated water content. Soupier mixes stretch a bag a little further and weaken the concrete a lot; the yield on the bag is the yield to plan on.

Searchers often arrive here from a cement calculator or concrete mix calculator query, so it is worth separating the jobs plainly. Those tools split a volume into ingredients — cement, sand, coarse aggregate and water in a stated ratio such as 1:2:4 — for people batching concrete from raw materials. This calculator stops one step earlier, at the volume itself and at factory pre-mix bags, where the ratio is already inside the bag. If you are batching from scratch, take this page's volume, then apply your mix ratio to it; the two tools chain together, and neither replaces the other.

Waste: why 10%, and when to use more

The waste percentage is the difference between the pour you drew and the pour that happens. Concrete is lost to forms that bow under pressure, to a base that is level on average but dips in the middle, to the layer that coats the mixer and the wheelbarrow, to spillage on the way, and to the simple fact that a slab screeded at 'about 4 inches' is 4 inches in some places and 4¾ in others. Every one of those losses comes out of the same truck or the same stack of bags, and none of them can be recovered once the pour starts. Running short is the expensive failure: a second delivery carries a short-load fee, a half-finished slab gets a cold joint where the two pours meet, and a fence line stops two holes from the end.

Use these settings as a starting point: 5% for a small, rigidly formed pour on a prepared, level base — a sonotube pier, a formed pad indoors. 10%, the default here, for a typical slab or footing on a compacted gravel base you have levelled yourself. 15% for rough or uneven ground, hand-dug footings, and first-time pours. 20% for augered post holes in stony soil, where the hole the auger actually cuts is wider and more ragged than its nominal diameter. The calculator shows the with-waste and without-waste figures separately precisely so this stays a decision you make, not a fudge baked silently into the headline number.

Ordering ready-mix by the cubic yard

Ready-mix concrete is sold by the cubic yard in the United States and by the cubic metre in most of the rest of the world, batched at a plant and delivered in a rotating drum truck. The calculator's yd³ figure is the number you give the plant, and the with-waste yd³ is the number to actually order. A few practicalities the volume alone does not tell you: most plants have a minimum order (often around a yard) and charge a short-load fee below a larger threshold; the truck needs access, a washout spot, and a crew ready when it arrives, because the load has a working life measured in minutes once water meets cement; and you will usually be asked for a strength (in psi) and a slump — choices this calculator deliberately does not make for you, because they depend on the job and your local code.

The crossover point is worth fixing in your head. One cubic yard is 45 bags of 80 lb — over a tonne and a half of dry mix to lift, carry, mix and place by hand. The 10 × 10 slab at 1.23 yd³ is 56 bags: doable for a fit crew with a rented mixer, miserable alone. Below about half a yard, bags usually win on cost and convenience; above a yard, the truck usually wins on everything except the delivery fee. Between the two sits the honest middle: price both, with this page's numbers in hand, before you decide.

How much concrete for common projects?

The table below uses this calculator's own method — rectangular volume, bag counts rounded up, no waste — so you can reproduce every row above in seconds. Depths are the common defaults for each job, not recommendations for yours.

ProjectSizeVolume80 lb bagsCubic yards
Small shed base8 × 6 ft × 4 in16.00 ft³270.59 yd³
Patio10 × 10 ft × 4 in33.33 ft³561.23 yd³
Walkway section10 × 3 ft × 4 in10.00 ft³170.37 yd³
Single driveway bay20 × 10 ft × 4 in66.67 ft³1122.47 yd³
Fence post hole12 in dia × 3 ft deep2.36 ft³40.09 yd³
Deck footing (sonotube)12 in dia × 4 ft deep3.14 ft³60.12 yd³

Read the fence-post row carefully, because it is where bag estimates most often go wrong in practice: the 2.36 ft³ assumes a clean 12-inch cylinder, but the post itself displaces some of that volume and the real hole is never a clean cylinder. Experienced fence builders budget two 80 lb bags per standard post hole as a floor and more for gate posts — the calculator gives you the geometry, and the waste setting is where you add the reality.

Concrete maths in Excel and by hand

Every figure on this page reduces to three formulas, which you can put in a spreadsheet in a minute. For a rectangle: = length_ft * width_ft * (depth_in / 12) gives cubic feet; divide by 27 for cubic yards and multiply by 0.0283168 for cubic metres. For a circle: = PI() * (diameter_in / 24)^2 * depth_ft — note the diameter in inches divided by 24 converts straight to the radius in feet, the step everyone forgets. Bag counts are = CEILING(volume_ft3 / yield, 1) with yields 0.3, 0.45 and 0.6. Check any sheet against the worked example in this guide before trusting it: 10, 10 and 4 must return 33.33 ft³, 1.23 yd³ and 56 bags of 80 lb. If your sheet returns 400 ft³, the depth was never converted from inches; if it returns 133 ft³ for the post hole, the diameter was used as the radius. Those two errors account for nearly every wrong concrete order ever placed, and both are visible the moment you test against a known case — which is why this guide leads with one.

Common concrete estimating mistakes

  • Mixing units mid-calculation. Feet for length, inches for depth, yards for the order — the 10 × 10 × 4 slab is 33 ft³, 400 'foot-inches' and 1.23 yd³, and only two of those numbers can be ordered. Convert everything to feet first, as this calculator does.
  • Using the diameter as the radius. On a round hole this quadruples the volume. A 12-inch hole needs about 4 bags per 3 feet of depth, not 16.
  • Rounding bags down or to nearest. 55.56 bags is 56 bags. The half bag you did not buy is the corner that does not get filled.
  • Skipping waste on rough ground. A neat 10% is not pessimism; on an unlevelled base it is simply what the dips consume.
  • Measuring the outside of the forms. Volume is the inside of the forms. Two 2-inch form boards on a 10 ft slab quietly remove about 3% of the pour if you measure outside-to-outside — and add it back as error if the forms were set inside the lines.
  • Forgetting the base. A 4-inch slab on a 4-inch gravel base means excavating 8 inches. The concrete calculator counts concrete; your digging is a separate, larger number.
  • Adding extra water to stretch bags. More water raises the apparent yield and lowers the strength, permanently. The yield figures assume the water on the bag's instructions.

What this calculator leaves out

  • Engineering. It does not choose a thickness, a strength grade, a mix design or reinforcement, and it does not check any building code. Structural work needs your local code and, where required, an engineer.
  • The base and the digging. Gravel depth, excavation volume, formwork and finishing materials are separate estimates; this page counts only the concrete itself.
  • Money. No prices, delivery fees, short-load charges or mixer hire — bag and ready-mix prices vary too much by place and week for a stored figure to be honest.
  • Irregular reality. The formulas assume perfect rectangles and circles at exactly the dimensions entered. The waste percentage is the tool provided for the gap between that ideal and your ground.
  • Safety. Wet concrete is caustic and heavy work is heavy. Follow the safety guidance in the sources below — gloves, eye protection and lifting sense are part of the job, not an afterthought.

Used within those limits, the calculator does the one job it claims: it turns your measurements into a defensible order — a volume in three units and a bag count you can show your working for — before any money or muscle is committed.